EV charger, Level 2
A dedicated 240V circuit and charger mounted where your car parks. We check your panel's spare capacity first.
- Distance from panel to parking spot
- Load manager if the panel is tight
Tell the Panel Passport your home's age and panel size, then switch on the upgrades you're thinking about. Watch the load climb, see sample "from" prices, then let us check it properly on site.
Toronto, ON · sample estimate
Tip: tap a breaker in the panel to switch an upgrade on or off.
Checking…
A rough illustration, not a load calculation. Sample prices in CAD, plus HST, ESA permit included. The real answer comes from an on-site check.
All figures are samples for this concept.
Every price is a sample "from" figure for a Toronto home. Your written quote lists the permit, the parts and anything that could change on the day.
A dedicated 240V circuit and charger mounted where your car parks. We check your panel's spare capacity first.
The circuit, outdoor disconnect and wiring your HVAC installer needs, ready before they arrive.
New panel and service, with the Toronto Hydro disconnect and reconnect booked for you.
Old porcelain-and-cloth wiring found in many pre-1950 homes. We map what's live, then rewire room by room.
Many insurers ask about knob-and-tube. You get a written letter of completion to send them.
Common in homes built in the late 1960s and 70s. The risk is at the connections, so we fit approved connectors at each device, or rewire where that makes more sense.
Please don't try this yourself. Ordinary connectors can make it worse.
In Ontario, the Electrical Safety Authority (ESA) oversees electrical work in homes. Here's how a permit works when Cedarline does the job.
The permit fee is a line on your written quote, never a surprise.
As the licensed contractor, we file the permit with ESA before work starts.
Done to the Ontario Electrical Safety Code.
ESA may inspect in person or review the job. We arrange it and attend.
You get the Certificate of Acceptance. Keep it for your insurer and for resale.
A good rule: if a contractor asks you to take out the permit in your own name, ask why. The licensed contractor doing the work should normally file it.
What to ask any electrician for, in one place. Open a line for a plain explanation.
In Ontario, a business doing electrical work for the public needs an Electrical Contractor License, and its number belongs on its ads and quotes. Look up any contractor on ESA's public lookup before you hire.
WSIB covers our crew if someone is hurt in your home. Ask any contractor for a current clearance certificate. We email ours with every quote.
Covers damage to your property during the job. Certificate sent before we start.
If something we installed fails because of how we installed it, we come back and fix it at no charge.
Same people, same truck, shoe covers on, and a labeled panel when we leave.

Master electrician · sample
Panel checks and service upgrades, explained without jargon.

309A electrician · sample
Old houses: knob-and-tube, aluminum wiring, careful plaster.

309A electrician · sample
EV chargers, heat pumps, load managers. English and French.
General advice only. If anyone is in danger, call 911.
Don't touch the panel or anything hot. If there's smoke or fire, get everyone out and call 911. Then call us.
Stay well back, at least 10 metres, and keep others away. Call 911 and your local utility. Never go near it.
That's usually a utility outage, not your panel. Check your utility's outage map before booking an electrician.
No. It's a quick picture to help you plan. We do a proper load calculation on site before quoting any upgrade.
Not always. Many 100A homes can add one with a load manager that shares power with other big appliances.
Book an inspection. You get what's there and the options in writing, for your insurer.
Sometimes. Programs change, so we check what's current when we quote. We never promise a rebate we can't confirm.
We reply the same working day with a time window and the electrician's name.